# Well Connected Auckland - Large MGF Pit

**Specifications:**

- 16m long x 8m wide x 6m deep.
- MGF 203 series frames x 2
- MGF knee braces x 2
- MGF 200 series struts together at mid-span
- KKD 600/6 trench sheets - 600mm wide x 6m long
- Temporary works design supplied by Hirepool Shoring complete with calculations and installation sequence drawings.

**Method:**

The first MGF frame is assembled then used as a guide for the trench sheets.

Trench sheets are pre-driven to depth - in this case 6m

A second frame is placed, excavation proceeds and the frames are lowered to pre-designed positions before being pumped out to the required pressure. Frames are hung from chains attached to the sheets.

![2013-09-23_11-32-31_773_compressed](https://www.hirepool.co.nz/media/rk2bmmu3/2013-09-23_11-32-31_773_compressed.jpg)

![2013-09-23_11-52-13_410_compressed](https://www.hirepool.co.nz/media/gybhbjfg/2013-09-23_11-52-13_410_compressed.jpg)

![img_0856_compressed](https://www.hirepool.co.nz/media/gfcloaci/img_0856_compressed.jpg)

![2013-09-24_10-26-03_951_compressed](https://www.hirepool.co.nz/media/rlobvivl/2013-09-24_10-26-03_951_compressed.jpg)

![img_0883_compressed](https://www.hirepool.co.nz/media/3vdleqy3/img_0883_compressed.jpg)

Source: https://www.hirepool.co.nz/shoring/projects/well-connected-auckland-large-mgf-pit