Date
October 2013
Location
Avondale, Auckland
Principal
NZ Transport Agency
Contractor
Brian Perry Civil

Specifications:

  • 16m long x 8m wide x 6m deep.
  • MGF 203 series frames x 2
  • MGF knee braces x 2
  • MGF 200 series struts together at mid-span
  • KKD 600/6 trench sheets - 600mm wide x 6m long
  • Temporary works design supplied by Hirepool Shoring complete with calculations and installation sequence drawings.

Method:

The first MGF frame is assembled then used as a guide for the trench sheets.

Trench sheets are pre-driven to depth - in this case 6m

A second frame is placed, excavation proceeds and the frames are lowered to pre-designed positions before being pumped out to the required pressure. Frames are hung from chains attached to the sheets.