- Date
- October 2013
- Location
- Avondale, Auckland
- Principal
- NZ Transport Agency
- Contractor
- Brian Perry Civil
Specifications:
- 16m long x 8m wide x 6m deep.
- MGF 203 series frames x 2
- MGF knee braces x 2
- MGF 200 series struts together at mid-span
- KKD 600/6 trench sheets - 600mm wide x 6m long
- Temporary works design supplied by Hirepool Shoring complete with calculations and installation sequence drawings.
Method:
The first MGF frame is assembled then used as a guide for the trench sheets.
Trench sheets are pre-driven to depth - in this case 6m
A second frame is placed, excavation proceeds and the frames are lowered to pre-designed positions before being pumped out to the required pressure. Frames are hung from chains attached to the sheets.